SL.
Topics
Quantity
Unit
1.
Area of Rooftop, Unit: Square Meter Square Feet Available rooftop area : Additional area as per definition of rooftop in Net Metering Guideline :
Note: Select the unit and insert your available rooftop area as per definition of Net Metering Guideline-2018. You can insert value either in Square Meter or Square Feet Unit.
Area Use Factor [Default Value is 9 m2/kWp, You can change it]
[For detail understanding, Read 'Net Meteting Guidebook' and Use 'Inter-Row-Spacing Calculator']
m2/kWp
2.
Sanctioned load of the consumer
kW
3.
Maximum capacity of solar system (cumulative output of inverters) as per "Net Metering Guideline-2018"
70% of Sanctioned load, not more than 10 MW
4.
Installed capacity of Solar Module to acheive the 3x [ DC:AC Ratio, Normally 1.2 times of the AC output Capacity]
:
times
5.
Approximate installation cost for 1 kWp rooftop solar system with 1 kW inverter
Thousand Taka
6.
Annual approximate electricity generation from the proposed 4x kWp rooftop solar system
Select the Calculation mode: Select: Select any one method SOLARGIS PVOUT Solar Radiation Data Plant Capacity Factor AC Output kWh/kWp/day (Yearly Average)
For Method-1: SOLARGIS PVOUT :